Home          Your notes are welcome: Editor@UpperWindpower.com             Most recent edit: Saturday October 19, 2013      Bg

NTS
NTS GmbH
Nature Technology Systems        
Team
"
NTS - Crosswind Systems"    "NTS Energy & Transports"  "NTS Energie-und Transportsysteme"
http://www.x-wind.de/   and   http://nts-transportsysteme.de/

(alternative spelling colloquial:  NTS X-Wind Technology) 
 

2014 notes
2013 notes

NTS Energie- und Transportsysteme GmbH  
NTS Energy & Transports  

Guido Luetsch (Managing Director, NTS Energy & Transports)    |  LinkedIn page |   Nov. 2012: Participant in AWEC-AWEIA bridge building | 

Berlin

founded by single investor Uwe Ahrens, CEO Guido Luetsch. Focus on "carousel" with extra: use skysails-like flexible kites, build circular roller coaster, let kites pull the carts, develops testing site in Mecklenburg-Vorpommern
Guido Luetsch [[Self cooling beverage cooler Guido Luetsch   5983662 ]]  Also found as:  Guido Lütsch

aka: NTS Energiesysteme

  • In 2009:
    Location: Berlin, DE
    Speaker: Guido Luetsch  (sic, Lütsch; both spellings are found)
    Title: Managing Director
    Primary Industry: Wind Power
    Executive Summary: The objective of the project is an innovative technology for the production of renewable energy by harnessing strong winds at a high altitude of 1.500 feet for less than 2 Cent/kWh. The concept assembles well known technologies: - Automatically steered kites and - Monorail-Systems into a base load power plant. NTS power plants have the capability to produce renewable energy for lesser costs than fossil fuels. As the wind blows about 80-90% of the time at 1.500 feet, the utilization rate of the high altitude power plant is at least three times higher than that of conventional windmills (20-30%). NTS shows for the first time a solution how to bring the kinetic energy of the strong winds at 1.500 feet to the ground.
       

 

20013
  • BHWE Bundesverband Höhenwindenergie i.G..    By taking over the presidentship of BHWE I stepped back as Managing Director of NTS by February 1st. As president of BHWE and chairman of the organization committee of AWEC 2013 I have to work independently in addition: The organization of AWEC 2013 is very time consuming and that would not match with my responsibilities as Managing Director of NTS. ~ Guido Lütsch    German Airborne Wind Energy Association      (Feb 2013)
  •  

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Let us know you and your interests.
News, notes, documents, files:  Editor@UpperWindpower.com
~~Kite Energy Community~~