Cousin topics re: QM, Metamaterials, Kite Matter    |    Forum Index of Topics    | 3r   | 

Topic
Snaggy-field mitigations for long-line pre-launch-lays
  • Snaggy brush, trees, objects may challenge pre-launch line lays.
  • Wind-direction changes challenge solutions.
  • Prevention of snags
  • Reduction of abrasion and cuts
  • Conducive line challenges in snaggy-field scenes

Send AWE notes and topic replies to editor@upperwindpower.com
April 6, 2020, post by Joe Faust
Snaggy-field mitations for long-line pre-launch-lays
  • Half-pipe line
  • Half-circle-topped stakes
  • Shaped-top of caution cones
  • Robust textile patches atop snaggy brush
  • High posted cross cables
  • Balloon lift at several stations
  • Human-assisted line lift
  • All-clear signaling

??post??