Topic
Snaggy-field mitigations
for
long-line pre-launch-lays
- Snaggy brush, trees, objects may challenge pre-launch line
lays.
- Wind-direction changes challenge solutions.
- Prevention of snags
- Reduction of abrasion and cuts
- Conducive line challenges in snaggy-field scenes
|
Send
AWE notes and topic replies to editor@upperwindpower.com
|
April
6, 2020, post by Joe Faust
Snaggy-field mitations for
long-line pre-launch-lays
- Half-pipe line
- Half-circle-topped stakes
- Shaped-top of caution cones
- Robust textile patches atop snaggy brush
- High posted cross cables
- Balloon lift at several stations
- Human-assisted line lift
- All-clear signaling
|
??post?? |