Topic Line Climbers
|
Send AWE notes and topic replies to editor@upperwindpower.com |
April 27, 2020, post by Joe Faust Line climber AWES to generate electricity using PTO loop being driven in one direction only during cycles of climb and de-climb Have line climber pull a a line of a working loop; at top end, have the line climber triggered to grabe the other side of the working loop while also changing AoA to sail down the main lifted taut line. The working loop then continues to go in just one direction to drive ground-gen in one direction only. Details may be openly developed. |
??post?? |